Maintenance package - Battery and Electric
·Goods receipt / torque multiplier is booked into the merchandise management system.
·Storage location is assigned and torque multiplier is temporarily stored
·Electrical safety test according to VDE
·Read out of the error memory (where possible) as well as analysis, troubleshooting
·Gearbox disassembly-cleaning-assembly
·New lubrication of gearbox
·Prepare torque multiplier for calibration
·Transfer serial and customer number to calibration software
·Torque multiplier is run warm
·Transfer torque multiplier to calibration room
·Adapt torque multiplier to measuring shaft
·Run characteristic curve (3x per torque value)
·Print certificate
·Laminate certificate
·Print torque table
·Stick on torque table
·Transfer to storage place
·Pack torque multiplier
·Create delivery note
·Transfer to goods issue